Monday, February 7, 2011

House Update February 7 2011

020711 House8
Roofing in 40 MPH winds.  We felt so bad for the workers.  The did such a phenomenal job regardless of the wind.

020711 House9020711 House7
Exterior doors were installed and HVAC began

020711 House6020711 House5020711 House4
Tar paper on the roof

020711 House1020711 House2
The double slider was installed last week that leads to the upper deck

020711 House3
All the plumbing was installed last week, this is the spigot for the pot filler behind our stove to make it easier to fill water for our tea kettle or pots for soup or pasta instead of filling in the sink then carrying it over

020711 House14
Our Carrier HVAC system on its side attached to the ceiling in the garage to give us plenty of floor space

020711 House13020711 House12
Some of the door handles to the exterior doors

020711 House11020711 House10
These doors have built in blinds so we can slide them open and closed for day light

1 comment:

Jessika said...

You're going to have so much room-- you won't know what to do with yourselves!

Congratulations-- looks great!