Thursday, March 17, 2011

Hardware and Hardwood

The cabinets are about 90% installed.  They still need to finish some of the crown molding and undermount trim.  They’ll finish these tasks up after the backsplash tile and undermount lights are installed.  Here are some photos Nick took with the nice camera, rather than photos from my iPhone.

IMG_9017
Desk area

IMG_9020
Area for the wall oven and microwave

IMG_9022
Cabinets for our wine glasses and wedding china

IMG_9025IMG_9028
Island put all together (left), nursery closet (right)

IMG_9036
Trim detail in the laundry room

IMG_9037IMG_9038
Master bedroom closet

IMG_9039IMG_9040
They wrap styrofoam around the windows and trim board before stuccoing!  Crazy how they do the whole process.

IMG_9042
Nicki and I talking about the process

IMG_9044
View from the deck

IMG_9047
Linen closet

IMG_9053
Pile of sawdust from the hardwood floor installation

IMG_9054
Kitchen with all the handles and hardwood floor

IMG_9057IMG_9059
Red oak planks

IMG_9061IMG_9062
They’re about 75% done with the installation of the hardwood floors.  They haven’t finished the hallway or stairs quite yet, they’ll be working on it tomorrow.  We haven’t decided what color stain we’ll do yet, but we’re thinking something neutral not too dark.  They also need to sand everything before they stain and seal.

IMG_9063IMG_9065IMG_9066IMG_9069
Upclose photo of the planks and hardware

IMG_9070IMG_9072
The chrome hardware we chose for the whole house

IMG_9073IMG_9075
Here’s a little profile picture of my belly at 32 weeks

IMG_9077
Cabinet above the refrigerator

IMG_9081IMG_9082
Desk (left) and wall oven, microwave cabinets (right)

IMG_9083IMG_9086IMG_9087IMG_9088
Our interior door design (left) and main bathroom vanity (right)

IMG_9089
Laundry Room

IMG_9090IMG_9091
Master bathroom

IMG_9092IMG_9093
Our interior doors, we opted for oil rubbed bronze hardware for the hinges.  They haven’t put the handles on yet.