Tuesday, March 15, 2011

March 14 and March 15 House Update

March 14 Update

031411 House1

Nick had to break into the house yesterday because they have locked the house down since all the interior is being worked on and to protect us from theft

031411 House3
Cabinet installation has begun all over the house, here is the start to the kitchen

031411 House11031411 House12
Since we aren’t putting in a fancy microwave we have a special cabinet that has doors that fold inward that will hide our microwave and rice cooker

031411 House10031411 House9
We went with an espresso stain in the bathrooms and laundry room

031411 House8031411 House7
Here is a bunch of the packaging the cabinets came in (left) and a garbage can drawer we’ll use for garbage and for recycling (right)

031411 House6031411 House5
Spice rack drawer we’ll use for our olive oil, fish sauce, soy suace, spices, etc etc (left) and here are some cabinets showing our full extension drawers (right)

031411 House4031411 House13
Cabinets in our mudroom that will house our utility sink (left) and some tall cabinets for linens in the main bathroom (right)

March 15 Update

031511 House1
Today’s progress on the cabinet installation.  It’s looking pretty good. They haven’t put the crown molding trim on the tops of the cabinets and the lower trim.  Lower trim will go on after the under counter lights are installed.

031511 House4031511 House5
Desk and China cabinets (left) and pantry shelves (right)

031511 House6031511 House7
Keyboard tray (left) and refrigerator opening (right)

031511 House8031511 House9
Espresso island (left) and master closet (right)

031511 House2031511 House3
Master closet (left) and nursery closet (right)

No comments: