House Update April 18 + 19

041811 House1
Part 1 of concrete poured on Monday (April 18)

041911 House1041811 House5
The driveway and walkway pad to the garden storage were poured

041811 House2041811 House4
All of the carpet was installed and stretched, still needs to be vacuumed

041811 House3
We are missing mirrors

041911 House3
Part 2 of concrete poured yesterday (April 19)

041911 House2
Sidewalk inspection happened on Monday so they poured yesterday and it looks great

041911 House4
The front stoop and walkway were also poured.  Yay we can finally get INTO the house through the front door instead of walking the plank