042211 House1
We are now about 7 days away from moving into our new house!  Here are some photos of things they recently finished.  The driveway, sidewalk and walkway are all poured, and the garage doors have been painted to match the trim of the house.

042211 House4042211 House3
All of the wainscoting, trim and doors have been painted and lacquered the Greek Villa color

042211 House2042211 House6
Most of the plumbing fixtures and tub have ben installed

042211 House5042211 House7
Lower deck is finished and the bench is all painted and hooks have been installed

042211 House14This is the lower deck all done and installed yesterday

042211 House8042211 House9
Kitchen pendants are installed.  Our builder ordered them from Pottery Barn, we need to change the bulbs on them so that they’re clear bulbs instead of translucent.

042211 House10042211 House15
Today the upper deck is 90% installed, the weather was perfect and the views were fantastic


042211 House11042211 House12
The water heater has been installed

042211 House20
The fireplace and bookcase all painted

042211 House13
This is our master bathtub with a little bit of wainscoting on the ouside and subway tile on the tub deck

042211 House16042211 House17
Fireplace is all done being painted and lacquered

042211 House18042211 House19
Nick is working on putting the plates on the low voltage boxes in the kitchen and book case because everything just got done being painted and lacquered

042211 House21042211 House22
The Geek Squad finally was able to deliver our new refrigerator, they had to remove the lower drawer to get it through the front door.  We’ve had to postpone the deliver twice already, so it was a relief to be able to get it done.

042211 House23042211 House24